Representative Project Experience · West Park, Florida

4-Unit Townhome Development in West Park

A ground-up, two-story residential development comprising approximately 6,000 square feet across four townhome residences in West Park, Broward County.

Each approximately 1,500-square-foot unit includes three bedrooms and 2.5 bathrooms and was completed for long-term rental use.

Completed two-story townhome development in West Park, Florida

Project Snapshot

Project Type
Four-unit townhome development
Location
West Park, Broward County
Building
Two stories · Approximately 6,000 SF
Units
Four · Approximately 1,500 SF each
Unit Layout
Three bedrooms · 2.5 bathrooms
Use
Long-term rental
Duration
Approximately 15 months
Scope
Ground-up project coordination through completion

Project Overview

Project execution included coordination of design development, permitting, site work, utilities, structural construction, trade activity, inspections and closeout.

The development required more than vertical construction. Zoning review, utility coordination, surface-water management and limited access on an infill lot all influenced the project’s sequencing and execution.

Navigating Zoning, Utilities, Drainage and Limited Site Access

The development required coordinated management of zoning review, utility requirements, Broward County’s surface-water management process and the physical constraints of constructing four residences on an infill lot.

Limited site access reduced the available space for material storage, deliveries, equipment movement and simultaneous trade activity. Construction sequencing and site logistics were managed within the restricted operating area to minimize conflicts among deliveries, field trades and required inspections.

The work required ongoing communication among county reviewers, utility providers, design professionals and field trades while required information, responses and construction sequencing were coordinated.

External reviews affected when certain portions of the work could proceed. Available work was advanced wherever practical while zoning, utility and surface-water requirements continued through the applicable review, approval and inspection processes.

Foundation construction for four-unit West Park townhome development
Foundation work advanced within the limited working area of an infill site.

Coordinated Project Execution

Design and Permitting Coordination

Project requirements were coordinated with the design professionals and applicable reviewing authorities before and during construction.

Site and Utility Coordination

Site work, utility requirements and related inspections were coordinated with the overall construction sequence.

Infill-Site Logistics

Deliveries, material staging, equipment access and trade activity were sequenced around the project’s limited working area.

Construction and Closeout

Structural construction, trade coordination, required inspections and project closeout were managed through completion.

Masonry construction underway on four-unit West Park townhome project
Ground-up masonry construction progressing across the four-unit development.
Two-story masonry shell of West Park townhome development
The completed masonry shell established the project’s two-story, four-unit configuration.

Completed Interiors

Completed kitchen in West Park townhome residence
Completed interior staircase in two-story townhome residence

Project Outcome

The completed development added four three-bedroom rental residences to the West Park market.

The project demonstrates experience coordinating the regulatory, infrastructure, site-logistics and construction demands involved in delivering ground-up multifamily housing on a constrained South Florida infill site.